LATEST NEWS & UPDATES

HELLIWELL FLOWERS MEZZANINE FLOOR PROJECT

Westwood Projects are making great progress with the installation works of mezzanine flooring for Helliwell Flowers based in Southampton.

Summary of the fit-out works:

  • Mezzanine floor installation
  • Number of Tiers: 1
  • Floor Size: 13200mm x 12000mm
  • Floor Height: 3987mm to deck – 3600mm clear underside ceiling finish
  • Column Grid: 6400mm x 3900mm
  • Design Load: 0.5kN/m2
  • Decking Material: 38mm P6 High Density Particle Board
  • Edge Protection: 22 linier metres of exposed edge
  • Pallet Gate: Rolled hollow section framed swing gate and end posts to suit a maximum opening of 1600mm

Date: 27/01/2023

DO YOU HAVE A NEW PROJECT?

Get in touch with us to discuss your fit-out, refurbishment, mezzanine floor or partitioning project, or to arrange your free site visit.  Find out how Westwood Projects can help you.

Contact us on 023 9298 9759 or info@westwood-projects.co.uk

CONTACT US

LATEST NEWS & UPDATES

HOW TO DIVIDE OPEN OFFICES WITHOUT LOSING FLOW

Learn how to divide open offices with partitions, acoustic planning and planned installation that protects daily workflow, privacy and business continuity.

COMMERCIAL FLOORING FOR HEAVY TRAFFIC THAT LASTS

Choose commercial flooring for heavy traffic with practical advice on durability, safety, maintenance and installation planning for busy UK workplaces.

WORKPLACE REFURBISHMENT GUIDE FOR BUSY SITES

A practical workplace refurbishment guide for UK businesses: plan scope, control disruption, meet compliance needs and create space that works harder well.